Airport Name |
Grant amount |
Project Description |
$236,070 |
Install 100LL fuel system with card reader | |
$228,120 |
Install jet A fuel system | |
$1,167,530 |
Expand apron north of terminal building; install apron lighting and fencing; install tie downs and mark apron; drainage improvements; demolition of pavement and utilities | |
$1,925,472 |
Construct Air Traffic Control Tower | |
$703,360 |
Construct terminal building and auto parking | |
$80,000 |
Design and construct a fueling pad and access turnaround | |
$1,920,703 |
Construct new air traffic control tower | |
$2,811,050 |
Reconstruct taxiway D; construct taxiway E; construct parallel taxiway B: stabilize taxiway A for temporary construction access; install signage taxiway Q; destination signs runway to apron; upgrade sign panels for new taxiway designation; and install erosion/ sedimentation controls and mobilization | |
$899,920 |
Rehabilitate and mark Runway 8-26; rehabilitate and mark Runway 4-22; rehabilitate apron, stub taxiway, and hangar access taxiway; replace low intensity runway lights with medium intensity runway lights and install rotating beacon and lighted wind cone | |
$9,909,980 |
Reconstruct Runway 33 South A/C holding bay; reconstruct taxiway A and improve geometric layout of taxiway A at intersections F, H, T & S; reconstruct/ reconfigure Taxiway A asphalt north A/C holding bay with concrete pavement; overlay taxiway A and replace medium intensity runway lights at taxiway A | |
$987,700 |
Rehabilitate and mark Runway 15-33 and Runway 1-19; rehabilitate northwest hangar access taxiway; terminal apron; parallel and cross taxiways for Runway 15-33; taxiway for Runway 1-19; and middle PCC apron; replace threshold lighting at Runway 15/33; replace existing Runway 1-19 guide sign panels; install LED wind cone and paint segmented circle; and replace existing beacon with rotating beacon and tower | |
$855,000 |
Construct 8 unit T-hangar and hangar access taxiway | |
$585,000 |
Construct 6 Unit T-Hangar and construct hangar access taxiway D | |
$720,000 |
Install game proof perimeter fencing and gates; install chain link fence; remove existing fence and airport property signs | |
$666,667 |
Construct hangar | |
$1,215,000 |
Install a game resistant perimeter fence | |
$503,000 |
Rehabilitate and mark Runway 18-36; rehabilitate apron and stub taxiway; rehabilitate and mark partial parallel taxiway; partial reconstruct hangar access taxiway; rehabilitate taxiway turnaround Runway 36 end; construct concrete fueling pad; expand hangar access pavement; erosion repair at grate inlet and replace wind cone segmented circle | |
$1,311,111 |
Construct new terminal building and reimbursement of a parking lot and access road |