• Skip to primary navigation
  • Skip to main content
  • TTI Home
  • TTI Library Catalog
  • Aviation Research Home
  • Contact Us
Texas A&M Transportation Institute logo
Aviation Research
  • About
  • System Planning and Research
  • Aviation Education
  • Texas Aviation Conference
  • Publications
    • Wingtips
  • News

New Austin Aero Terminal At Bergstrom International Airport

April 24, 2025

AUSTIN- Austin Aero Jet Center has signed a 40-year lease for 70 acres on the new Austin Bergstrom International Airport, which is scheduled to open next May. Construction is underway for an FBO and 65,000-square-foot hangar. The terminal will be a two-story building made of glass, limestone and stucco. The interior will consist of granite and marble. The facility is scheduled for completion next April. The Jet Center will be open 24 hours a day, and will offer maintenance, aircraft cleaning, fuel and hangar space.

Tweet
Share
0 Shares

Filed Under: Wingtips December 1998

  • The State of Texas
  • Texas Homeland Security
  • Texas Veterans Portal
  • State Expenditure Database
  • Statewide Search
  • State Auditor’s Office Hotline
  • TAMUS Risk, Fraud & Misconduct Hotline
  • Site Policies
  • Open Records Policy
  • Statutorily Required Reports
  • TTI Rules
  • Veterans
  • Equal Opportunity
  • COVID-19 Info
  • Jobs
Member of the Texas A&M University System

© 2025 Copyright Statement / Legal Notices and Policies

Comments, suggestions, or queries? Contact us!

Texas A&M Transportation Institute · 3135 TAMU · College Station, Texas 77843-3135

(979) 317-2000