Airport Name | Grant Amount | Project Description |
Sugar Land Regional Airport | $2,547,710 | Construct replacement hangar for taxiway F relocation |
Victoria Regional Airport | $1,813,550 | Repair/ replace watering system for Aircraft Rescue and Fire Fighting |
Commerce Municipal Airport | $2,272,528 | Construct taxiway and new turnaround, mill and overlay Runway 18-36; apron and old turnaround; remove and expand apron pavement; mark pavement; install precision approach path indicators-2 Runway 18-36 with LED upgrade; install medium intensity runway lights with LED upgrade and signage; and install beacon |
Addison Airport | $2,151,740 | Reconstruct taxi lane Victor; enclose drainage taxiway Victor; demolish pavement and construct temporary taxi lane for Victor reconstruction |
Cherokee County Airport | $752,684 | Rehabilitate and mark Runway 14-32; rehabilitate apron and taxiways and construct hangar access taxiway |
Palestine Municipal Airport | $484,070 | Rehabilitate and mark Runway 18-36; rehabilitate taxiway to Runway36, taxiway to Runway 27, and taxiway to Runway 18 |
Brooks County Airport | $1,810,790 | Rehabilitate and mark Runway 17-35; mill and overlay northeast section of Runway 14-32, northeast section of apron taxiway to Runway 14; mark Runway 14-32; expand south apron; rehabilitate southeast section of Runway 14, southeast section of apron, parallel, cross and midfield taxiway for Runway 17-35; widen taxiway fillet to Runway 35 end; replace lighted wind cone and light supplemental; clear grub wildlife habitat and clear out runway safety area |
Caldwell Municipal Airport | $1,465,900 | Rehabilitate and mark Runway 15-33; rehabilitate and mark aprons and taxiways; construct hangar access taxiways and apron area for aircraft run-up; construct nested T-hangars; |
North Texas Regional Airport/Perrin Field | $725,090 | Construct apron for hangar development in terminal area; airfield drainage repairs; and construct wildlife security fence in north and south areas with gates |
Big Spring McMahon-Wrinkle Airport | $1,439,636 | Design and construct 12 unit T-hangar and hangar access taxiway |
Bay City Municipal Airport | $964,985 | Rehabilitate and mark Runway 13-31; rehabilitate apron taxiway; hangar access taxiways and apron; rehabilitate and mark parallel taxiway and cross taxiway; reconstruct entrance road, terminal auto parking and hangar access road; and repair drainage north taxiway |
Jones Field/Bonham | $150,000 | Install automated weather observing system |
Grants Received
Grants Received
Airport Name | Grant Amount | Project Description |
Lancaster Regional Airport | $421,690 | Design and construction services to install self serve fuel farm |
Dallas Executive Airport | $9,380,329 | Reconstruct Runway 13-31 from North Runway 17-35 intersection to Runway 31 end; reconstruct 17-35 at intersection 13-31 and reconstruct Runway 13-31 shoulders; reconstruct taxiway A1 and A5; realign taxiway for replacement A3; reconstruct portions taxiway A and D; demo taxiway A2; runway shoulder compression joint sealant; install new electrical components for replacement medium intensity runway lights; and install LED lights |
Draughon-Miller Central Texas Regional Airport | $600,000 | Reimbursement for construction services to expand and repair main entrance parking lot; construct auto parking; construct fuel loop roadway; and construct new entrance road |
Burnet Municipal Airport – Kate Craddock Field | $8,522,910 | Repair, overlay and mark Runway 1-19; expand apron; reconstruct and relocate taxiway and connecting stubs; relocate fuel farm and reconfigure terminal area; relocate road Runway 19 runway protection zone; replace medium intensity runway lights, replace electrical vault; relocate utilities; relocate wind cone and segmented circle and supplemental; and install and remove fencing |
Castroville Municipal Airport | $2,808,920 | Extend and mark Runway 15 end; extend and mark parallel taxiway to Runway 15 end; reconstruct South apron; construct permanent run-up area; hangar apron pavement to new 8 unit T-hangar; extend medium intensity runway lights Runway 15 end; relocate precision approach path indicators Runway 15 end; relocate County Road 4711; install fencing and gate with new boundary; and install signage |
Fort Worth Meacham International Airport | $1,525,140 | Demolish terminal area taxi lane pavement; construct and mark terminal area taxi lane; and relocate utilities terminal area taxi lane |
Texas State Technical College -Waco Airport | $2,387,890 | Reconstruct taxiway H to Runway 17R; reconstruct northern portion of taxiway A between taxiway B and H; rehabilitate and mark taxiway B |
Port Isabel- Cameron County | $949,500 | Joint seal, crack seal, slurry seal and mark Runway 17-35; mark chevron stub taxiway; seal PCC joints and mark terminal apron; install electric vault building with enviro additions; replace rotating beacon and tower; install emergency generators; install new tie downs on terminal building apron; and install hold signs |
McKinney National Airport | $6,320,930 | Reconstruct and expand terminal apron and relocate auto parking |
Majors Fields | $1,674,155 | Reconstruction of eastern taxiway K |
Grants Received
Airport Name | Grant amount | Project Description |
Stinson Municipal Airport | $4,455,520 | Overlay and mark Runway 14-32; overlay taxiway A, B & C: replace medium intensity runway lights Runway 14-32 a; replace medium intensity taxiway lights taxiway A, B, C and upgrade airfield guidance signs Runway 14-32, taxiways A, B & C. |
Curtis Field/Brady Municipal Airport | $660,000 | Design and construction services to construct hangar. |
Bridgeport Municipal Airport | $7,061,990 | Extend, widen and mark Runway 18-36; overlay Runway 18-36; relocate parallel taxiway; overlay apron and cross taxiways; replace medium intensity runway lights; install precision approach path indicators and remove/demo Chevron pipeline. |
Texas Gulf Coast Regional Airport | $1,015,999 | Design and construction services to construct hangar and hangar adjacent to terminal; and auto parking. |
Eastland Municipal Airport | $1,345,880 | Construct terminal building; construct new entrance road and auto parking; expand terminal apron; install sewer line to terminal building; relocate terminal fence and gate. |
San Marcos Municipal Airport | $450,000 | Design and construction services for hangar access security fencing and auto parking. |
McCampbell-Porter Airport | $1,937,440 | Rehabilitate and mark Runway 13-31; rehabilitate new apron and taxiway; reconstruct old terminal apron; rehabilitate and mark parallel taxiway; rehabilitate all hangar access taxiways; and improve hanger fuelarea drainage. |
McGregor Executive Airport | $2,492,813 | Rehabilitate and mark Runway 17-35; reconstruct north apron; expand T-hangar apron; reconstruct entrance road; construct T-hangars; install new 6″ water line and fire hydrants; repair trench drain concrete; refurbish beacon tower; and install new segmented circle. |
San Marcos Municipal Airport | $5,770,500 | Overlay Runway 13-31 and reduce width; reconstruction taxiway J at Runway 13 intersection; relocate and replace medium intensity runway lights for 100′ width runway 13-31; replace runway signs; airfield pavement markings; install city owned precision approach path indicator 2 Runway 13-31; improve airport road entrance; Memoradum of agreement; and flight check for construction. |
Van Zandt County Regional Airport. | $604,620 | overlay Runway 17-35 and stub taxiway; overlay and repair apron; stripe and mark Runway 17-35. |
Jasper County-Bell Field | $2,597,430 | Rehabilitate and mark Runway 18-36; expand and rehabilitate apron; rehabilitate parallel taxiway to Runway 18-36 and cross taxiways; install precision approach path indicators-2 Runway 18-36; drainage improvements for Runway and taxiway system; install fencing and install stand-by generator to run medium intensity runway lights, and precision approach path indicators. |
Nueces County Airport | $1,102,030 | Rehabilitate and mark Runway 13-31 and stub taxiway; rehabilitate apron, hangar access taxiways, turnarounds at Runway 13-31; construct additional T-hangars and hangar access pavement; and install game proof fence and gates North East perimeter. |
Grants Received
Airport Name | Grant amount | Project Description |
Mineral Wells Airport | $867,802 | Construction services to replace medium intensity runway lights Runway 17-35 and Runway 13-31; install precision approach path indicators-2 Runway 17-35 and flight check precision approach path indicator 2 on Runway 17-35 and 13-31. |
Fort Worth Meacham International Airport | $2,064,736 | Construction services to roto-mill, overlay, and mark Runway 17-35; overlay portions of taxiway C between Runway 17-35 and taxiway B; replace airfield lighting control and monitoring system; replace 2 precision approach path indicator -4 Runway 17-35; replace medium intensity runway lights Runway 17-35; and upgrade Runway signage and new regulator. |
Higgins-Lipscomb County Airport | $727,810 | Construction services to reconstruct apron and stub taxiway and install segmented circle. |
Alice International Airport | $5,328,740
|
Construction services to rehabilitate and mark Runway 13-31 and 17-35; reconstruct south section taxiway A and taxiway B at Runway 17; rehabilitate taxiway A, B, C, D, E; rehabilitate apron; reconstruct fuel apron; construct run-up pad at Runway 31; regrade east boundary drainage ditch; replace medium intensity runway lights Runway 13-31and Runway 17-35; install medium intensity taxiway lights at Runway 17-35 and Runway 13-31; install precision approach path indicator-2 Runway 17-35; install precision approach path indicator-4 Runway 13-31; install new equipment vault and regulators for runway lights and taxiways lights; replace lighted wind cone and install four supplemental wind cones; replace airfield guidance signs and add install medium intensity taxiway lights on taxiway system. |
Marian Airpark | $1,216,210 | Engineering and design for rehab; construct and mark runway 17-35; construct connecting taxiway to runway 17 end. |
Reagan County Airport | $2,677,500 | Construction services to construct turnaround Runway 16; pave crosswind Runway 9/27; mark Runway 9/27; install fence; clear and grub 15 acres in runway protection zone Runway 9 and environmental studies. |
Cleburne Regional Airport | $1,638,870 | Construction services to rehabilitate and mark Runway 15-33; rehabilitate terminal apron, hangar area 1, 2, 3, 4 and 5; rehabilitate parallel taxiway A and B and cross taxiways; and replace medium intensity runway lights. |
Palacios Municipal Airport | $156,140 | Design and construction services to repair faulting spalling concrete slabs on Runway 13-31; renumber Runway 17/35 and Runway 08/26. |
Port Isabel- Cameron County Airport | $600,000 | Design and construction services for new Jet A and 100LL fuel farm system. |
Eagle Lake Regional Airport | $1,107,530 | Construction services to construct two nested T-Hangar units; hangar access taxiway; and reconstruct fuel farm apron. |
Slaton Regional Airpark | $759,820 | Construction services to construct parallel taxiway. |
Bowie Municipal Airport | $953,510 | Construction services to reconstruct south parallel taxiway Phase 2; concrete drainage slope at hangar taxilanes; replace runway exit signs; and mark striping at fuel facility. |
Mid-Way Regional Airport | $2,343,510 | Construction services to construct new north apron and new middle apron; expand south apron and construct automobile parking lot. |
Franklin County Airport | $871,330 | Construction services to overlay and mark Runway 13-31. |
Midland Airpark | $1,245,000 | Design and construction services to construct two 6-unit T hangars and improve drainage for two new T-hangars. |
Albany Municipal Airport | $367,120 | Construction services to rehabilitate and mark Runway 17-35; rehabilitate apron, parallel taxiway and stub taxiways; and replace wind cone. |
Giddings-Lee County Airport | $1,102,400 | Design and construction services to construct T-Hangar access and construct 10 unit T-hangar. |
Goldthwaite Municipal Airport | $1,089,316 | Construction services to construct T-hangars and T-hangar apron; and construct access road. |
Perry Lefors Field | $4,507,080 | Construction services to rehabilitate and mark Runway 5-23; overlay and mark Runway 17-35; rehabilitate hangar access taxiways; rehabilitate parallel and cross taxiways for Runway 5-23; rehabilitate terminal area apron and hangar access taxiways; and overlay parallel and cross taxiways for Runway 17-35. |
Mid Valley Municipal Airport | $4,713,070 | Construction services to overlay and mark 13-31; widen existing runway to 75 feet; rehabilitate east side hangar access taxiway and terminal apron; overlay east side taxiway; extend medium intensity runway lights Runway 13; relocate utilities; improve drainage and install fence. |
Major Samuel B. Cornelius Field | $2,055,850 | Construction services to construct concrete fueling pad; reconstruct hangar access taxiways and fuel apron; reconstruct public apron; reconstruct, rehabilitate and mark taxiway A; rehabilitate and mark Runway 2-20; rehabilitate and rehabilitate and mark taxiway B and C. |
Fort Worth Spinks Airport | $2,836,500 | Design and construction services to reconstruct taxiway C, G and H; construct temporary access to Runway at taxiway D; construct new parallel taxiway to C to allow access to taxiway C; construct a new access taxiway at taxiway J; apron joint seal replacement; construct northwest service road; drainage study at east side development area; drainage improvements to Stone Road, Wing Way Road, building and auto parking at West side; drainage improvements to ditches from terminal apron to south T-hangars; install strip drain East edge apron; and install gate northwest perimeter fence. |
Texas Gulf Coast Regional Airport | $4,186,800 | Construction services to construct terminal apron; relocate portion of cross taxiway E and G; install medium intensity taxiway lights and signs for taxiway E and apron. |
Grants Received
Airport Name | Grant amount | Project Description |
Hearne Municipal Airport | $528,380 | Install game fence with four gates; clear fence line and install signage at the Hearne Municipal Airport. |
Caldwell Municipal Airport | $1,265,900 | Design and construction services to rehabilitate and mark Runway 15-33; rehabilitate and mark aprons and taxiways; construct hangar access taxiways and apron area for aircraft run-up; construct nested T-hangars |
Cleburne Municipal Airport | $1,595,360 | Rehabilitate and mark Runway 15-33; rehabilitate terminal apron, hangar area 1, 2, 3, 4 and 5; rehabilitate parallel taxiway A and B and cross taxiways; replace medium intensity runway lights; and install LED lights |
Dimmit County Airport | $1,583,040 | Reconstruct, widen and mark south parallel taxiway; rehabilitate and mark Runway 13-31; rehabilitate taxiway B, turnaround Runway 31 end, aprons; north parallel taxiway and design and construction of precision approach path indicator 4 approach |
Mount Pleasant Regional | $1,540,060 | Construct two 10 unit T-hangars and new hanger access taxiway |
Limestone County Airport | $2,860,810 | Construct new south aircraft apron; construct cross taxiways and partial parallel taxiway to Runway 36; reconstruct apron; rehabilitate north hangar access taxiways |
Scholes International Airport/Galveston | $1,153,440 | Replace PCC slabs North Apron and clean joints north apron |
Lancaster Regional Airport | $1,130,000 | Design and construction of terminal building and new terminal auto parking with entrance road |
Navasota Municipal Airport | $516,333 | Design and construct new fuel facility |
Navasota Municipal Airport | $881,250 | Design and construction to construct apron for fuel facility and box hangars; construct access taxiway for T-hangar |
Grants Received
Airport Name |
Grant amount |
Project Description |
Brownwood Regional Airport |
$2,645,300 |
Overlay and mark Runway 17-35; rehabilitate Runway 17-35 shoulders; rehabilitate and mark taxiway D; relocate medium intensity runway lights thresholds and precision approach path indicators; and temporary runway lighting and marking. |
A.L. Mangham, Jr. Regional Airport |
$732,110 |
Rehabilitate and mark Runway 18-36 and apron stub taxiway; widen taxiway Y; rehabilitate all hangar access taxiways and install directional signs |
Texas State Technical College -Waco Airport |
$2,450,500 |
Rehabilitate and mark Runway 17R-35L; rehabilitate and mark taxiway A, D, E and G; rehabilitate, shade hanger taxi lane, taxi land from terminal apron to Runway 17R-35L; rehabilitate taxi lane from terminal apron to taxiway H, main terminal apron, and shoulders; and taxiway G for FOD control; reconstruct hardstand at 30L; removal of taxiway C; rehabilitate 17L-35R circuit and install precision approach path indicators |
Fort Worth Spinks Airport |
$887,740 |
Construct connecting taxiway to new Northeast apron; construct new apron Northeast side; and drainage improvements along taxiway C and cover drainage ditch. |
Draughon-Miller Central Texas Regional Airport |
$7,890,000 |
Reconstruct and mark taxiway A, B, C, D, E, & F; reconstruct apron; rehabilitate and mark terminal apron; rotomill, overlay and mark Runway 2-20; regrade Runway 2-20 shoulder; adjust medium intensity runway lights elevations Runway 2-20; install standby generators; and install supplemental windsock Runway 2 |
Dalhart Municipal Airport. |
$626,250 |
Rehabilitate and mark Runway 17-35 and Runway 3-21; rehabilitate and mark taxiway A, B, D and E; replace sections of concrete apron; and seal apron concrete pavement joints. |
Big Spring McMahon-Wrinkle Airport |
$987,500 |
Rehabilitate and strengthen terminal area apron; and construct concrete section of terminal apron |
Decatur Municipal Airport |
$135,000 |
Design and construction to install fencing and security gates |
Robert R. Wells, Jr. Airport |
$66,000 |
Install an Automated Weather Observing System- AV and reimbursement for utilities |
Orange County Airport |
$400,000 |
Design and construct hangar access taxiway and box hangars |
South Texas International Airport at Edinburg |
$1,000,000 |
Design and construction of fuel farm |
Hillsboro Municipal Airport |
$500,000 |
Design and construct hangar access taxiway and 100′ x 125′ hangar at the Hillsboro Municipal Airport |
Ralph M. Hall/Rockwall Municipal Airport |
$392,900 |
Drainage repair and improvements |
South Texas Regional at Hondo Airport |
$1,243,564.00 |
Clean, repair and seal PCC joints Runway 13-31; mark Runway 13-31; rehabilitate center apron and taxilanes; rehabilitate PCC joints on south apron and taxilanes; rehabilitate PCC joints on north apron and taxilanes; clear grub and install game proof fencing along east edge of Runway 17L runway protection zone; install hold short sign markings for taxiway C; blade and grade runway edges Runway 13-31. |
Lone Star Executive Airport |
$17,841,190.00 |
Extend and mark Runway 14/32; reconstruct sections of taxiway A & D; construct holding apron Runway 14; construct partial parallel taxiway and Runway 14/32 and medium intensity taxiway lights; extend partial parallel taxiway and medium intensity taxiway lights; extend medium intensity runway lights Runway 14/32; relocate precision approach path indicator-4 Runway 14; memorandum of agreement with FAA for glideslope, medium intensity approach lighting system with runway alignment indicator lights and precision approach path indicator; replace and relocate localizer, glideslope and medium intensity approach lighting system with runway alignment indicator lights; construct perimeter medium intensity approach lighting system with runway alignment indicator lights; relocate utilities for Runway extension; terminate FM 1484; reroute ditches along FM 1484; install fencing; reimburse land for instrument approach Runway 14; clear trees object free zone Runway 14; and install signage. |
Castroville Municipal Airport |
$200,000 |
installation of Jet-A fuel system |
Grants Received
Airport Name |
Grant amount |
Project Description |
C. David Campbell Field-Corsicana Municipal Airport |
$550,000 |
Construct hangar and hangar access taxiway |
Coulter Field/Bryan |
$633,000 |
Install precision approach path indicator-2 Runway 14-32; replace medium intensity runway lights regulators; construct electrical vault and associated gear switches; Runway shoulder grading |
Olney Municipal Airport |
$687,534 |
Design and construct T-hangars and hangar access taxiway |
Jim Hogg County Airport/Hebbronville |
$433,500 |
Construct game proof fence with gate and threshold sighting surface lights |
Lampasas Municipal Airport |
$125,000 |
Design and construction services to: construct hangar access taxiway; construct apron entrance; remove concrete slabs and pole barn; and install gate |
Lampasas Municipal Airport |
$500,000 |
Design and construction to extend hangar 6 units |
Dallas Executive Airport |
$2,568,430 |
Clear brush along the north, install fencing to the north perimeter with two gates; install fencing to the south perimeter with clearing and two gates; install fencing to the east/west perimeter with clearing and three gates; construct light duty perimeter road with culverts and ditch; and construct asphalt airfield service road with culverts and ditches |
Hearne Municipal Airport |
$630,000 |
Design and construction services to install game fence with four gates; clear fence line and install signage |
Caddo Mills Municipal Airport |
$525,000 |
Design and construction services to clean and seal PCC joints at Runway 17-35and Runway 13-31; mark Runway 17-35 and Runway 13-31; clean and seal PCC joints taxiway C; repair culvert and pavement Taxiway C; drainage system inventory, evaluation and recommendations |
Hamilton Municipal Airport |
$809,220 |
Rehabilitate and mark Runway 18-36; rehabilitate hangar access taxiways; rehabilitate and mark partial parallel taxiway, north taxiway, and terminal apron; and construct new hangar access taxiway |
Terrell County Airport |
$372,250 |
Replace low intensity runway lights with medium intensity runway lights at Runway 13-31; replace rotating beacon and tower; and install emergency generator |
Jackson County Airport |
$850,000 |
Rehabilitate and mark Runway 14-32; reconstruct apron; rehabilitate parallel and cross taxiways; and rehabilitate hangar access taxiway |
Terry County Airport |
$1,364,400 |
Rehabilitate and mark Runway 13-31; reconstruct west side hangar access taxiway; construct access taxiway and aprons for west side hangars; rehabilitate and mark north hangar access; rehabilitate and repair apron; rehabilitate taxiway B; extend existing apron south around T-hangars; install medium intensity runway lights at Runway 13-31; and replace rotating beacon and tower |
Grants Received-Fall 2012
Airport Name |
Grant amount |
Project Description |
$236,070 |
Install 100LL fuel system with card reader | |
$228,120 |
Install jet A fuel system | |
$1,167,530 |
Expand apron north of terminal building; install apron lighting and fencing; install tie downs and mark apron; drainage improvements; demolition of pavement and utilities | |
$1,925,472 |
Construct Air Traffic Control Tower | |
$703,360 |
Construct terminal building and auto parking | |
$80,000 |
Design and construct a fueling pad and access turnaround | |
$1,920,703 |
Construct new air traffic control tower | |
$2,811,050 |
Reconstruct taxiway D; construct taxiway E; construct parallel taxiway B: stabilize taxiway A for temporary construction access; install signage taxiway Q; destination signs runway to apron; upgrade sign panels for new taxiway designation; and install erosion/ sedimentation controls and mobilization | |
$899,920 |
Rehabilitate and mark Runway 8-26; rehabilitate and mark Runway 4-22; rehabilitate apron, stub taxiway, and hangar access taxiway; replace low intensity runway lights with medium intensity runway lights and install rotating beacon and lighted wind cone | |
$9,909,980 |
Reconstruct Runway 33 South A/C holding bay; reconstruct taxiway A and improve geometric layout of taxiway A at intersections F, H, T & S; reconstruct/ reconfigure Taxiway A asphalt north A/C holding bay with concrete pavement; overlay taxiway A and replace medium intensity runway lights at taxiway A | |
$987,700 |
Rehabilitate and mark Runway 15-33 and Runway 1-19; rehabilitate northwest hangar access taxiway; terminal apron; parallel and cross taxiways for Runway 15-33; taxiway for Runway 1-19; and middle PCC apron; replace threshold lighting at Runway 15/33; replace existing Runway 1-19 guide sign panels; install LED wind cone and paint segmented circle; and replace existing beacon with rotating beacon and tower | |
$855,000 |
Construct 8 unit T-hangar and hangar access taxiway | |
$585,000 |
Construct 6 Unit T-Hangar and construct hangar access taxiway D | |
$720,000 |
Install game proof perimeter fencing and gates; install chain link fence; remove existing fence and airport property signs | |
$666,667 |
Construct hangar | |
$1,215,000 |
Install a game resistant perimeter fence | |
$503,000 |
Rehabilitate and mark Runway 18-36; rehabilitate apron and stub taxiway; rehabilitate and mark partial parallel taxiway; partial reconstruct hangar access taxiway; rehabilitate taxiway turnaround Runway 36 end; construct concrete fueling pad; expand hangar access pavement; erosion repair at grate inlet and replace wind cone segmented circle | |
$1,311,111 |
Construct new terminal building and reimbursement of a parking lot and access road |
Grants Received/Summer 2012
Airport Name |
Grant amount |
Project Description |
Fort Worth Meacham International Airport |
$3,180,792 |
Reconstruct apron A east of taxiway E |
Reagan County Airport/Big Lake |
$546,800 |
Rehabilitate and mark Runway 16-34; rehabilitate apron, stub taxiway, Taxiway B; rehabilitate and mark hangar access taxiways; rehabilitate and mark stub taxiway A; mark taxiways; replace/ upgrade lighted windcone and segmented circle; install 20 ft. security gate/controlled access; and install game fencing |
Paris Cox Field
|
$1,507,200 |
Crack seal Runway 14-32, taxiways A-1, B, C and apron; overlay and mark parallel taxiway A; and reconstruct headwall and culvert at terminal building |
Scholes International Airport/Galveston |
$2,903,900 |
Drainage improvements |
Wharton Regional Airport |
$787,300 |
Rehabilitate Runway 14-32, parallel and cross taxiways; rehabilitate apron and hangar access taxiways; construct new south entrance taxiway to terminal apron; widen north entrance taxiway to terminal apron; and upgrade/ replace 9 taxiway culverts |
Gillespie County Airport/Fredericksburg |
$1,468,600 |
Rehabilitate and mark Runway 14-32; rehabilitate north apron, hangar access taxiway, and terminal apron; rehabilitate and repair parallel taxiway and taxiway B, C and D; construct helicopter parking ramp; replace medium intensity runway lights at Runway 14-32; relocate and upgrade AWOS to south end for apron expansion and access road; and install a game proof fence |
San Saba County Municipal Airport |
$1,250,000 |
Extend and mark Runway 13-31; rehabilitate Runway 13-31, terminal apron, hangar access taxiways and taxiways; construct turnaround Runway 31 end; construct turnaround Runway 13 end; install precision approach path indicator 2 Runway 13-31; replace existing and extend medium intensity runway lights runway 13-31; replace wind cone rotating beacon and tower and install signage |
Smithville Crawford Municipal Airport
|
$424,300 |
Rehabilitate and mark Runway 17-35; rehabilitate stub taxiway, apron, and turnaround Runway 35; rehabilitate and mark partial parallel taxiway to Runway 17; and remove PSIL and install precision approach path indicator-2 at Runway 17-35 |
Avenger Field/Sweetwater |
$999,020 |
Rehabilitate and mark Runway 17-35 and Runway 4-22; rehabilitate taxiway A, B, C and D; rehabilitate T-hangar access; rehabilitate north public apron and terminal apron; and improve drainage |
Stephens County Airport/Breckenridge |
$657,000 |
Rehabilitate and mark Runway 4-22 and all airfield pavements; construct concrete fueling apron; replace medium intensity runway lights Runway 17-35; replace lighted wind cone and segmented circle; and replace rotating beacon and tower |
Floydada Municipal Airport |
$257,700 |
Rehabilitate and mark Runway 17-35, stub taxiway and apron; replace rotating beacon and windsock and rehabilitate; repair segmented circle and rehabilitate fuel containment slab |
Georgetown Municipal Airport |
$1,275,270 |
Improve runway safety area and Runway 36 and improve runway safety area southwest side Runway 36; rehabilitate north hangar access area; rehabilitate mid hangar access area; rehabilitate corporate taxiway; and widen taxilane to T-hangars E, F & G and relocate fire hydrant |
Arlington Municipal Airport |
$8,249,864 |
widen taxiway; construct 3 connecting taxiways to new west side taxiway; runway shoulder repair; construct west parallel taxiway/ runway; realign south cross taxiway to new west stub taxiway; install runway exit/hold signs; install medium intensity runway lights; install west side electrical vault; install taxiway a guidance signs; relocate ASOS; relocate segmented circle; adjust underground utilities; thermoplastic marking; drainage improvement; and memorandum of agreement for ASOS |
Dimmit County Airport/Carrizo Springs |
$334,400 |
Airfield lighting rehabilitate; replace lighted wind cone; install apron safety/ security lighting |
Live Oak County Airport/George West |
$151,280 |
Install game proof fencing |
Aransas County Airport/Rockport |
$900,000 |
Construct deer/hog resistant fencing with cattle guard |
Victoria Regional Airport |
$1,212,200 |
Replace AvGas and Jet A fueling system in south terminal area |
Grants Received
Airport Name |
Grant amount |
Project Description |
Odessa/Schlemeyer Field |
$1,125,237 |
Construct terminal building and parking lot |
Collin County Regional Airport at McKinney |
$10,729,200 |
Construct replacement runway; construct taxiway B5 segment 1, B1 segment 1, and taxiways B2, B3 and B4; construct replacement Runway 18-36, and replacement runway; convert existing Runway 17-35 to taxiway B; install medium intensity approach lighting system at Runway 36; electrical and electronics for runway replacement |
Fort Worth Meacham International Airport |
$2,247,500 |
Construct perimeter road |
Stephenville Municipal Airport/Clark Field |
$1,003,280 |
Construct 12 unit hangar with access paving |
Hemphill County Airport/Canadian |
$500,000 |
Install game proof fencing |
Oldham County Airport/Vega |
$363,309 |
Install fueling system and construct fueling apron |
Cherokee County Airport/Jacksonville |
$371,880 |
Install game fencing; clearing and grubbing, install security and access gates and drainage improvements |
Palestine Municipal Airport |
$803,300 |
Rehabilitate and mark apron; reconstruct taxiway A; remove asphalt; raise apron inlets; repair concrete drainage structures; install barricades and markings for pavement closure; and improve 18″ storm sewer |
Mustang Beach/Port Aransas |
$140,000 |
Replace existing automated weather observing system |
Dimmitt County/Carrizo Springs |
$140,000 |
Install an automated weather observing system |
Lockhart Municipal Airport |
$762,720 |
Rehabilitate and mark Runway 18-36; rehabilitate and mark taxiways; rehabilitate hangar access taxiways and apron; rehabilitate FBO apron; and update signage |
Coulter Field/Bryan |
$140,000 |
Install an automated weather observing system |
TSTC-Waco Airport |
$1,000,000 |
Construct a terminal building |