• Skip to primary navigation
  • Skip to main content
  • TTI Home
  • TTI Library Catalog
  • Aviation Research Home
  • Contact Us
Texas A&M Transportation Institute logo
Aviation Research
  • About
  • System Planning and Research
  • Aviation Education
  • Texas Aviation Conference
  • Publications
    • Wingtips
  • News

Grants Received

March 19, 2025

Groveton-Trinity County Airport
$345,000
Design and construction services to replace low intensity runway lights with medium intensity runway lights Runway 16-34.

Ralph M. Hall/Rockwall Municipal Airport
$516,800
Rehabilitate and mark Runway 17-35; rehabilitate taxiways, apron, t-hangar access taxiways; construct ditches; install culverts and pavement repairs.

Arlington Municipal Airport
$1,533,120
Reconstruct/overlay hangar access pavement south apron areas and edges.

Pearland Regional Airport
$1,000,000
Design and construct new signage, pavement marking and security fencing improvements; and entrance road feasibility study.

Mesquite Metro Airport
$2,502,600
Rehabilitate and mark Runway 18-36, joint crack seal; repair asphalt shoulders Runway 18-36, taxiway A and stub taxiways; repair Runway 18-36 ends and resurvey to 6,000 ft.; install new medium intensity taxiway lights; install drainage flume between taxiway A and apron; reconstruct city-owned box hangar apron; replace medium intensity runway lights; replace/repair trench drain on airside of terminal building; replace airfield guidance signs; and install drainage improvements – safety end treatments.

Eagle Lake Regional Airport
$1,786,000
Rehabilitate and mark Runway 17-35; rehabilitate apron and taxiway; place/repair culvert on north end of Runway 17; expand apron; construct/reconfigure south end connecting taxiway to Runway 35 new threshold; rehabilitate AG pad; rehabilitate hangar access taxiway; replace medium intensity runway lights /vault/relocate threshold/precision approach path indicator’s 2’s Runways 17-35.

Hall-Miller Municipal Airport
$885,000
Rehabilitate and mark Runway 5-23; rehabilitate and mark parallel taxiway A, hangar access taxiway C, taxiway B to apron; rehabilitate apron; install runway edge markings for turf Runways 15-33; install reflective “hold” sings and markings on Taxiway A at Runway 15-33.

Kickapoo Downtown Airpark
$2,823,800
Expand apron and drainage improvements Phase 3.

Tweet
Share
0 Shares

Filed Under: Wingtips Summer 2018

Texas A&M Transportation Institute

3135 TAMU

College Station, TX 77843-3135

(979) 317-2000

State Resources

The State of Texas

Texas Homeland Security

Texas Veterans Portal

State Expenditure Database

Statewide Search

State Auditor’s Office Hotline

Policies

TAMUS Risk, Fraud & Misconduct Hotline

Site Policies

Open Records Policy

Statutorily Required Reports

TTI Rules

Veterans

Equal Opportunity

Jobs

A member of the Texas A&M University System

© Copyright 2025 Texas A&M Transportation Institute (TTI)